All Projects

Home/All Projects
All Projects2020-09-20T22:10:31+06:00
1209, 2011

Hydrological & Morphological Study for the amua Dhon River

By |September 12th, 2011|Categories: ALL PROJECTS|

Hydrological & Morphological Study for the amua Dhon River Hydrological & Morphological Study for the amua Dhon River River Adjoining Area for construct a road bridge over amua dhon river, under Jhalokhati District. From May 2011 to July 2011• Detail hydrological analysis of the project area.• Soil investigation, Topographic Survey, EIA study etc.• Preliminary design, details working design & drawings.• Preparation of details cost estimate, tender documents, bill of [...]

1209, 2010

Supervision of Storm Water Pumping Station and Drainage Canals

By |September 12th, 2010|Categories: ALL PROJECTS|

Supervision of Storm Water Pumping Station and Drainage Canals Supervision of Storm Water Pumping Station and Drainage Canals (Package-DS-3, Phase-II) From May 2010 to June 2016 The Project shall comprise of the activities related to the preparation of the “Dhaka Storm Water Drainage” component of tile proposed project, which would include: Preparation of Detailed Designs (DD) and Bidding Documents (BD) for the construction of two new pumping stations at Rampura [...]

1209, 2007

Dhaka-Chittagonj Water Supply & Sanitation Project

By |September 12th, 2007|Categories: ALL PROJECTS|

Dhaka-Chittagonj Water Supply & Sanitation Project Dhaka-Chittagonj Water Supply & Sanitation Project (Package: DS-3), Bangladesh under World Bank fund, 2007 – 2009 The project obtain techno-economic, socially and environmentally acceptable solutions to relieve city dwellers from sufferings from water logging problem and floods by improving drainage facilities, and to obtain support for assistance in procurement, and supervision of implementation of some or all of the identified activities which will [...]

1209, 2007

Technical Assistance for Central Zone Power Distribution (CZPDC)

By |September 12th, 2007|Categories: ALL PROJECTS|

Technical Assistance for Central Zone Power Distribution (CZPDC) Technical Assistance for Central Zone Power Distribution (CZPDC) Corporatization Support, Bangladesh under JBIC fund, July – December 2007 Support Bangladesh Power Development Board (BPDB) to establish Central Zone Power Distribution Company (CZPDC) efficiently as possible and to facilitate CZPDC after its establishment to functionalize as early as possible. The objectives of the project is to identify CZPDC as is issues and [...]

1209, 2006

Strategic Environmental Assessment of Dhaka Metropolitan Development Plan

By |September 12th, 2006|Categories: ALL PROJECTS|

Strategic Environmental Assessment of Dhaka Metropolitan Development Plan Strategic Environmental Assessment of Dhaka Metropolitan Development Plan, Under RAJUK, Bangladesh under World Bank fund, 2006 – 2007 The project mentioned the details sectors covered in the plan (Traffic, Health, Housing Development and others); Environmental issues discussed in the DMDP. Listed the local stakeholders associated with these sectors. Described briefly about the organizations that are going to review and implement the [...]

1209, 2006

Earthquake and Tsunami Emergency Support Project

By |September 12th, 2006|Categories: ALL PROJECTS|

Earthquake and Tsunami Emergency Support Project Earthquake and Tsunami Emergency Support Project (Package 28) [TAR 39127], Indonesia (Nanggroe Aceh Darussalam and Nias in North Sumatra), [ADB GRANT No.0002-INO] under ADB fund, 2006 – 2007 Indonesia was severely affected by the earthquake and tsunami of December 2004. The Government subsequently requested the Asian Development Bank [ADB] to fund the rehabilitation and reconstruction of selected of roads and bridges in the [...]

1209, 2005

Feasibility and Detailed Design of Sub-projects under SSWRDSP-II

By |September 12th, 2005|Categories: ALL PROJECTS|

Feasibility and Detailed Design of Sub-projects under SSWRDSP-II Feasibility and Detailed Design of Sub-projects under SSWRDSP-II, Bangladesh under ADB fund [Loan No: 1831-BAN (SF)/TA NO: 3683-BAN] 2005-2008 This Project will undertake implementation of a further 300 water management subprojects located throughout the country. The overall objectives of the Project are to support the Government’s poverty reduction effort through the increase of sustainable agriculture and fishery production. The Project’s objective [...]

1209, 2005

Earthquake and Tsunami Emergency Support Project

By |September 12th, 2005|Categories: ALL PROJECTS|

Earthquake and Tsunami Emergency Support Project Earthquake and Tsunami Emergency Support Project (Package 3-Agricultural Component), Indonesia under ADB fund [ Grant No. 0002-INO] 2005-2008 The agriculture component will cover about 11 affected districts in the Aceh and North Sumatra provinces. The first phase districts (Aceh Besar, Aceh Utara, Bireuen, Nias, and Pidie) include those where the majority of the communities in the affected areas are intact and the district [...]

1209, 2005

Rehabilitation/ Improvement of Facilities in Galle and Tangalle Fishery Harbours

By |September 12th, 2005|Categories: ALL PROJECTS|

Rehabilitation/ Improvement of Facilities in Galle and Tangalle Fishery Harbours Rehabilitation/ Improvement of Facilities in Galle and Tangalle Fishery Harbours Damaged by Tsunami Disaster, Sri Lanka under JICA fund , 2005-2007 The main scope of works under Galle Fishery Harbour include: Demolition of Building and Facilities; Refrigeration Ice Plant, Processing Room; Building work: Ice Plant Building, CFHC Office Building, Landing & Auction Space, Canteen Welfare Shop; Civil Work: Quaywall; [...]

1209, 2005

North Eastern State Roads Project, India

By |September 12th, 2005|Categories: ALL PROJECTS|

North Eastern State Roads Project, India North Eastern State Roads Project, India under ADB fund [ADB TA No. 4378-IND] 2005 – 2006 The goal of the TA was to facilitate economic growth, poverty reduction and environmental action by improving the North Eastern State Roads network and road connectivity to the national and subregional road networks. The TA identified 2,500 km of priority roads and prepare a loan project that [...]

1209, 2005

Town Power Distribution Project, Khulna, Jessore and Khustia

By |September 12th, 2005|Categories: ALL PROJECTS|

Town Power Distribution Project, Khulna, Jessore and Khustia Town Power Distribution Project, Khulna City Corporation, Jessore and Khustia Municipality, Barisal City Corporation and Faridpur Municipality. Bangladesh Under ADB fund [ ADB Loan No. 1884-BAN (SF)5] 2005 – 2007 The Bangladesh Power Development Board has planned to undertake expansion, renovation and reinforcement of Power Distribution System in the five designated towns under the 5-Town Distribution Project. Asian Development bank has [...]

1209, 2005

Marine and Fisheries Sector Strategy Study, Indonesia under ADB fund

By |September 12th, 2005|Categories: ALL PROJECTS|

Marine and Fisheries Sector Strategy Study, Indonesia under ADB fund Marine and Fisheries Sector Strategy Study, Indonesia under ADB fund [ADB TA No 4551-INO] 2005 – 2006 The main purpose of the TA was to formulate and disseminate a medium-term marine and fisheries sector strategy to support the Government in developing policy, institutional reforms and investments to promote sustainable and pro-poor marine and fisheries development and resource management. The [...]

1209, 2004

Policy Instruments for Air Quality Improvement in South Asian Cities, Dhaka

By |September 12th, 2004|Categories: ALL PROJECTS|

Policy Instruments for Air Quality Improvement in South Asian Cities, Dhaka Policy Instruments for Air Quality Improvement in South Asian Cities, Dhaka, Bangladesh under ADB fund [ADB RSC No. C40203-BAN] 2004 The scope of the study was cover: (i) an documentation of the level and major sources of urban air emissions in the three cities, (ii) an assessment of current economic incentives and MBIs (emission charges, fees, taxes, etc. [...]

1209, 2004

Preparing the Gas Sector Development Project, Bangladesh

By |September 12th, 2004|Categories: ALL PROJECTS|

Preparing the Gas Sector Development Project, Bangladesh Preparing the Gas Sector Development Project, Bangladesh under ADB fund [ADB TA No. 4332-BAN] 2004-2005 The objective of the project was to conduct a socio-economic impact assessment of infrastructure project particularly power projects. Review the related documents, existing information and the works already done. Conduct survey on power project beneficiaries, which includes rural households, industrial, commercial customers, to investigate their livelihood and [...]

1209, 2004

Southern Province Rural Economic Advancement Project, Sri Lanka

By |September 12th, 2004|Categories: ALL PROJECTS|

Southern Province Rural Economic Advancement Project, Sri Lanka Southern Province Rural Economic Advancement Project, Sri Lanka under ADB fund [ADB Loan No. 1849 – SRI (SF)] 2004-2008 The objective of the project is to support the Government’s efforts to accelerate economic growth and create income and employment opportunities in Southern Province. This is to be accomplished by increasing private sector participation and supporting the devolution of responsibility for planning [...]

1209, 2003

Reactive Power Compensation and Installation of Capacitor Bank Project

By |September 12th, 2003|Categories: ALL PROJECTS|

Reactive Power Compensation and Installation of Capacitor Bank Project Consultancy Services on Reactive Power Compensation and Installation of Capacitor Bank Project under Dhaka Electric Supply Authority, Dhaka, Bangladesh under Government of Bangladesh fund [DESA Contract No. 1826] 2003-2004 Study of the existing distribution system, voltage drop analysis, active-reactive load flow, voltage control study, and recommendation of location and capacity of switched type capacitor bank of 250 nos. 11 kV [...]

1209, 2003

Technical Assistance for Thematic Evaluation Studies

By |September 12th, 2003|Categories: ALL PROJECTS|

Technical Assistance for Thematic Evaluation Studies for 2003 – IES: ADB Technical Assistance for Thematic Evaluation Studies for 2003 – IES: ADB Assistance in the Power Sector in Bangladesh, All over Bangladesh under ADB fund [ADB TA No. 6097-REG] 2003 The objective of the TA was to assist the Asian Development Bank in conducting a socio-economic impact assessment of infrastructure projects particularly power sector projects. To assist ADB undertaking [...]

1209, 2001

Consultancy Services for Techno-Economic Feasibility Study of Power Generation

By |September 12th, 2001|Categories: ALL PROJECTS|

Consultancy Services for Techno-Economic Feasibility Study of Power Generation Consultancy Services for Techno-Economic Feasibility Study of Power Generation at Bakhrabad Gas Fields, Comilla, Bangladesh under Government of Bangladesh fund [ BGFCL Contract No: 04/2001] 2001 Carried out detailed techno-economic feasibility study of power generation facilities with 100-120 MW capacity at Bakhrabad Gas Field on commercial basis including technical aspects, legal aspects of incorporating power generation activities into the AOA [...]

1209, 2001

Consultancy Services for the Prepayment Metering Pilot Project

By |September 12th, 2001|Categories: ALL PROJECTS|

Consultancy Services for the Prepayment Metering Pilot Project  Consultancy Services for the Prepayment Metering Pilot Project under Bangladesh Power Development Board, Chittagong, Bangladesh, under KfW and Government of Bangladesh fund [BPDB Contract No. 09382] 2001- 2004 Rehabilitation of the existing network, installation and maintenance of at least 7000 metering units and of related vending systems and management of all customers on three selected 11 KV feeders. TCIL provided services [...]

1209, 2000

Corporatization of Bangabandhu Bridge, Phase – I: Feasibility Study

By |September 12th, 2000|Categories: ALL PROJECTS|

Corporatization of Bangabandhu Bridge, Phase – I: Feasibility Study Corporatization of Bangabandhu Bridge, Phase – I: Feasibility Study, Dhaka, Tangail and Sirajgonj, Bangladesh under Government of Bangladesh fund 2000-2001 Monitoring the complete system within the project, ensure effective operation, impact and sustainability of actions. Monitoring the change in transport & freight and transport & cost. Analysis of existing financial models and proposed alternate. Detailed study, survey, data collection, evaluation [...]

1209, 2000

Ashuganj Power Station Modernization Project

By |September 12th, 2000|Categories: ALL PROJECTS|

Ashuganj Power Station Modernization Project, Ashuganj Ashuganj Power Station Modernization Project, Ashuganj, Bangladesh under KfW fund [Contract No. 4724P03] 2000-2003 Detailed study, preparation of documents, and supervision of erection/installation/ construction for modernization of the power station.

1209, 2000

Gas Transmission and Distribution TA Project, Indonesia

By |September 12th, 2000|Categories: ALL PROJECTS|

Gas Transmission and Distribution TA Project, Indonesia Gas Transmission and Distribution TA Project, Indonesia under ADB fund [ADB RSC No. C00527-INO] 2000 The project undertakes a pre-appraisal of the Gas Transmission and Distribution Project in Indonesia. TCIL provided services for reviewing proposed configuration, routing, construction arrangements, and operating conditions of the gas transmission pipeline, prepared a social analysis in accordance with ADB Guidelines, identified social impact mitigation measures and [...]

1209, 1999

Survey, Planning, Design and Supervision of Line and Sub-station works

By |September 12th, 1999|Categories: ALL PROJECTS|

Survey, Planning, Design and Supervision of Line and Sub-station works Consultancy Services for Survey, Planning, Design and Supervision of Line and Sub-station works under 18-town Power Distribution Project, Phase-II of Bangladesh Power Development Board, Jessore and Kushtia, Bangladesh, under Government of Bangladesh fund [BPDB Contract No. 09307] 1999 – 2003 Planning, design, and supervision for improvement, extension of existing electrical system of 30 sq. km. of two towns to [...]

1209, 1998

Detail Design of 10 Hydraulic Structures under SSWRDSP of LGED

By |September 12th, 1998|Categories: ALL PROJECTS|

Detail Design of 10 Hydraulic Structures under SSWRDSP of LGED Detail Design of 10 Hydraulic Structures under SSWRDSP of LGED, Panchagar, Pirojpur, and Chuadanga, Bangladesh under ADB fund, 1998The project conducted detailed design of ten hydraulic structures in different location of Bangladesh with different design parameters. The structures were for FCD (flood control and drainage), WRS (water retention structure), and irrigation structure. [...]

1209, 1998

Pre-Feasibility and Detailed Design of Subprojects under proposed SSWRDSP

By |September 12th, 1998|Categories: ALL PROJECTS|

Pre-Feasibility and Detailed Design of Subprojects under proposed SSWRDSP Pre-Feasibility and Detailed Design of Subprojects under proposed SSWRDSP in Eastern side, Several districts in Eastern side of Bangladesh under Government of Bangladesh fund, 1998 – 2000The project conducted pre-feasibility and detailed engineering design including preparation of all drawings, and estimates. TCIL provided services for field survey, analysis, and preparation of reports and documents, pre-feasibility and detailed engineering design including preparation [...]

1209, 1998

Jamuna Bridge Railway Link Supervision Project, Tangail and Sirajganj

By |September 12th, 1998|Categories: ALL PROJECTS|

Jamuna Bridge Railway Link Supervision Project, Tangail and Sirajganj Jamuna Bridge Railway Link Supervision Project, Tangail and Sirajganj, Bangladesh under ADB fund [ADB Loan No. 1561- BAN] 1998-2003 Design and construction supervision of all the components related to railway link including embankment, track, bridges, yards, other civil structures, signals, and telecommunication. TCIL provided services to conduct field visit and data collection for socio-economic and engineering aspects; Carried out sub-soil [...]

1209, 1998

Feasibility and Detail Design Subprojects under SSWRDSP of LGED

By |September 12th, 1998|Categories: ALL PROJECTS|

Feasibility and Detail Design Subprojects under SSWRDSP of LGED Feasibility and Detail Design Subprojects under SSWRDSP of LGED, Different districts of Bangladesh under ADB fund 1998-2000 The objective of the project was to develop sustainable stakeholder driven small-scale water resources management system with special attention to the poorer section of the population by beneficiary participation in construction, agriculture extension, fishery extension, and aquaculture development. The components of this feasibility [...]

1209, 1996

Rehabilitation of Bheramara Gas Turbine Power Station Project

By |September 12th, 1996|Categories: ALL PROJECTS|

Rehabilitation of Bheramara Gas Turbine Power Station Project Supervisory Consultancy Services for Rehabilitation of Bheramara Gas Turbine Power Station Project, Bheramara, Kushtia, Bangladesh, under GOB fund [BPDB Contract No. 09248] 1996 – 1998 Supervision of the turn-key contractor’s work for rehabilitation of the power plant including sub-soil investigation, checking and approval of design and drawings, supervision, installation and erection of equipment, testing and commissioning of 3×20 MW power [...]

1209, 1996

Organizational Reform of Bangladesh Railway (Phase-II)

By |September 12th, 1996|Categories: ALL PROJECTS|

Organizational Reform of Bangladesh Railway (Phase-II) Organizational Reform of Bangladesh Railway (Phase-II), Bangladesh under ADB fund [ADB TA No. 1819-BAN] 1996-1997 Analysis of the impact of the earlier phase of the Project and recommendation necessary measures for organizational reform of Bangladesh Railway (BR), TCIL main responsibilities include collect and analysis of different records of BR; engage the local consultants, support staff and logistics; all other assistance necessary for [...]

1209, 1995

Physical Features and Land Use Survey of Badda Area

By |September 12th, 1995|Categories: ALL PROJECTS|

Physical Features and Land Use Survey of Badda Area Physical Features and Land Use Survey of Badda Area, Dhaka, Bangladesh under UNCHS fund 1995 The project objective was to provide base information on physical features and land use for the planning, design and preliminary costing of various development components emerging from the preparation of Detailed Areas Plan. TCIL provided consultancy services in the field of physical planning, drainage/municipal [...]

1209, 1995

Fourth Railway Project: Jamuna Bridge Railway Link Project

By |September 12th, 1995|Categories: ALL PROJECTS|

Fourth Railway Project: Jamuna Bridge Railway Link Project Fourth Railway Project: Jamuna Bridge Railway Link Project, Tangail and Sirajganj, Bangladesh, under ADB fund [ADB TA No. 2235-BAN] 1995 –1997 The project was to assist the Government of Bangladesh to assess technical and economic feasibility including environmental, social and other impact, for the provision of a meter-gauge railway on the Jamuna bridge including railway approaches at both ends connecting [...]

1209, 1995

Energy Conservation in the Industrial Sector of Bangladesh

By |September 12th, 1995|Categories: ALL PROJECTS|

Energy Conservation in the Industrial Sector of Bangladesh Energy Conservation in the Industrial Sector of Bangladesh, Bangladesh, under ADB fund [ADB PPTA No. 1973-BAN] 1995-1996 The objective of the project was to assist the government in formulating energy conservation programs, technology restructuring and investment recommendations in the identified industrial sub-sectors (cement, fertilizer, sugar, pulp and paper, iron and steel, and jute and textile). The conservation measures fell into [...]

1209, 1994

Organizational Reform of Bangladesh Railway (Phase-I)

By |September 12th, 1994|Categories: ALL PROJECTS|

Organizational Reform of Bangladesh Railway (Phase-I) Organizational Reform of Bangladesh Railway (Phase-I), Bangladesh, under ADB Fund, 1994 Analysis and recommendation for organizational reform of Bangladesh Railway (BR) such as collect and analysis of different records of BR; engage all the local consultants, support staff and logistics; and all other assistance necessary for project implementation. TCIL was responsible for collect and analysis of different records of BR; engage all [...]

1209, 1994

Dhaka Integrated Flood Protection Loan Project

By |September 12th, 1994|Categories: ALL PROJECTS|

Dhaka Integrated Flood Protection Loan Project Dhaka Integrated Flood Protection Loan Project: Detailed Engineering Design and Construction Supervision, Dhaka, Bangladesh, under ADB fund [ADB Loan No. 1124-BAN (SF)] 1994-2000 The Project comprised of 136 sq km priority west area of the Dhaka City. The objectives of the project were to provide a flood free and secure living environment and to improve the urban efficiencies and environmental conditions in [...]

1209, 1994

Consultacy service for the runway construction of Dhaka airport

By |September 12th, 1994|Categories: ALL PROJECTS|

Consultacy service for the runway construction of Dhaka airport Consultacy service for the runway construction of Dhaka airport. It was a project of Bangladesh Biman took place in 1994. Supervision, Erection, Construction, Testing and Commissioning works under Sylhet 90 MW Combined Cycle Power Plant Project (2nd Unit ) Fenchugonj, Sylhet under Bangladesh Power Development Board, Bangladesh under Government of Bangladesh Fund. 2007-2008. Review proposed combined cycle power plant (2nd [...]

1209, 1993

Resettlement of the affected people by Jamuna Multipurpose Bridge

By |September 12th, 1993|Categories: ALL PROJECTS|

Resettlement of the affected people by Jamuna Multipurpose Bridge Resettlement of the affected people by Jamuna Multipurpose Bridge Project, Bangladesh, under World Bank Fund, 1993 – 1994 Resettlement of the affected people by Jamuna Multipurpose Bridge. The consultants have been engaged to: (a) advise the JMBA-RU on management decisions and related, (b) assist the JMBA-RU in monitoring the effectiveness of the Resettlement Unit staff and contracted agencies and [...]

1209, 1992

Study of Biman and Civil Aviation, Bangladesh

By |September 12th, 1992|Categories: ALL PROJECTS|

Study of Biman and Civil Aviation, Bangladesh Study of Biman and Civil Aviation, Bangladesh, under USAID fund, 1992 Detailed survey and planning for upgrading to international standard of all the airports in Bangladesh for efficient air traffic management. TCIL provided consultancy services as well as support services with all logistics.

1209, 1992

Consultancy Services of Dhaka Integrated Flood Protection Project

By |September 12th, 1992|Categories: ALL PROJECTS|

Consultancy Services of Dhaka Integrated Flood Protection Project Detailed Engineering Design and Construction Supervision, and Project Management Consultancy Services of Dhaka Integrated Flood Protection Project (Bridging Services), Bangladesh, under ADB Fund [ADB Loan No. 1124-BAN (SF)] 1992 Rehabilitation of the Western Flood Protection Embankment (Tongi-Gabtoli-Kellermorh) by means of appropriate remedial measures determined through field investigation and laboratory testing including design of 4 sluice gates; design of about 14km [...]

1209, 1992

Establishment of Fish Landing, Preservation and Distribution Project

By |September 12th, 1992|Categories: ALL PROJECTS|

stablishment of Fish Landing, Preservation and Distribution Project Establishment of Fish Landing, Preservation and Distribution Project, Monoharkhali, Bangladesh, under JICA Fund, 1992-1994 Establishment of facilities for fish landing, preservation and distribution including jetty, pontoon, whole-sale fish market, cold storage, ice plant, administrative building, land reclamation and river protection works, canal bridge and other project facilities. TCIL was responsible for Co-ordination and technical assistance in implementation supervision; Designing of [...]

1209, 1991

Basic Design of Monoharkhali Fish Landing

By |September 12th, 1991|Categories: ALL PROJECTS|

Basic Design of Monoharkhali Fish Landing Basic Design of Monoharkhali Fish Landing, Preservation and Distribution Facilities Project, Chittagong, Bangladesh, under JICA Fund, 1991 The aim of the project was to provide the fishermen with modern fish landing, storage and distribution facilities. Services included sub-soil investigation, topographic and contour survey; marketing survey; river current and tide survey; assistance in structural and architectural design; and design of water supply and [...]

1209, 1991

Flood Action Plan 13: Operation and Maintenance Study

By |September 12th, 1991|Categories: ALL PROJECTS|

Flood Action Plan 13: Operation and Maintenance Study Flood Action Plan 13: Operation and Maintenance Study, Bangladesh, under British ODA and JICA Fund, 1991- 1992 Studied the effectiveness of O&M of FCD/I projects and to recommend appropriate measures to overcome the constraints against effective O&M and to ensure effective participation in the project activities by the beneficiaries. TCIL provided consultancy services in engineering and institutional aspects of the [...]

1209, 1991

Flood Action Plan 12: FCD/I Agricultural Study

By |September 12th, 1991|Categories: ALL PROJECTS|

Flood Action Plan 12: FCD/I Agricultural Study Flood Action Plan 12: FCD/I Agricultural Study, Bangladesh, under British ODA and JICA Fund, 1991-1992 FAP -12 aimed at assessment of the impacts of flood control, drainage, and irrigation projects on environment, agriculture, livestock, and fisheries and to recommend measures to overcome the constraints on their effectiveness. TCIL provided consultancy services on engineering and institutional aspects of the project as well [...]

1209, 1991

Feasibility Study of Dhaka Integrated Flood Protection Project (FAP-8B)

By |September 12th, 1991|Categories: ALL PROJECTS|

Feasibility Study of Dhaka Integrated Flood Protection Project (FAP-8B) Feasibility Study of Dhaka Integrated Flood Protection Project (FAP-8B), Bangladesh, under ADB Fund [ADB TA No. 1318-BAN] 1991 Feasibility details for the flood protection, drainage and environmental improvement of 136 sq km of Dhaka urban area; reviewing existing financial and physical monitoring and reporting procedures of government and design a set of simplified accounting, budgetary control and management information [...]

1209, 1990

Post-Evaluation Study of Baramanikdi Sub-Project

By |September 12th, 1990|Categories: ALL PROJECTS|

Post-Evaluation Study of Baramanikdi Sub-Project Post-Evaluation Study of Baramanikdi Sub-Project under Small Scale Flood Control, Drainage and Irrigation Project, Faridpur, Bangladesh, under IFAD Fund [IFAD Loan No.137-BA] 1990 Post-implementation evaluation of the Flood Control, Drainage and Irrigation Project of Baramanikdi, executed by the Bangladesh Water Development Board with IFAD loan (137-BA) and to recommend improvement measures. The project components were (i) Engineering and soil survey; (ii) Detailed socio-economic [...]

1209, 1990

Improved Retting Practices for Augmenting Quality of Jute

By |September 12th, 1990|Categories: ALL PROJECTS|

Improved Retting Practices for Augmenting Quality of Jute Improved Retting Practices for Augmenting Quality of Jute in Bangladesh under EEC fund, 1990-1998 Consultancy services for excavation/re-excavation of derelict ponds/tanks/canals/road-side ditches and khas ponds/tanks/canals under EEC financed project “Improved Retting Practices for Augmenting Quality of Jute in Bangladesh”. Training of the farmers in cultivation and retting for improving the jute fiber. Assessment and suggestion on the effect of jute [...]

Leave A Message

We Are Just One Click Away From You