Dhaka-Chittagonj Water Supply & Sanitation Project

Dhaka-Chittagonj Water Supply & Sanitation Project (Package: DS-3), Bangladesh under World Bank fund, 2007 – 2009

The project obtain techno-economic, socially and environmentally acceptable solutions to relieve city dwellers from sufferings from water logging problem and floods by improving drainage facilities, and to obtain support for assistance in procurement, and supervision of implementation of some or all of the identified activities which will form part of the Dhaka Storm Water Drainage Component of the proposed World Bank financed project. The Project shall comprise of the activities related to the preparation of the “Dhaka Storm Water Drainage” component of tile proposed project, which would include: Preparation of Detailed Designs (DD) and Bidding Documents (BD) for the construction of two new pumping stations and drainage; Study of the retention ponds, and environmental assessment and preparation of environmental management and mitigation plans for the construction of the pumping stations, Preparation of the Terms of Reference (TOR) and Request for Proposals (RFP) for the preparation of storm water drainage Master Plan to meet demand up to 2025.

Key Details

Project Start

2007

Project End

2009

Country

Bangladesh