Jamuna Bridge Railway Link Supervision Project, Tangail and Sirajganj

Jamuna Bridge Railway Link Supervision Project, Tangail and Sirajganj, Bangladesh under ADB fund [ADB Loan No. 1561- BAN] 1998-2003

Design and construction supervision of all the components related to railway link including embankment, track, bridges, yards, other civil structures, signals, and telecommunication. TCIL provided services to conduct field visit and data collection for socio-economic and engineering aspects; Carried out sub-soil investigation, laboratory testing and other necessary investigations. Conducted engineering surveys; benchmark survey, cross section survey, longitudinal survey of the existing embankment; prepared approximate cost estimate of the above structures; Identified and recommended various design options of project facilities supported with hydrological and geo-technical analysis; Assisted in establishing quality control procedures; compaction test, CBR test, carried out construction supervision and contract administration; Assisted in pre-qualification of contractors, bidding, evaluation of bids, and awarding contracts; Maintained close liaison with and assisted PMO and Local Executing Agencies to: (a) developed O & M procedures; (b) prepared frame work for monitoring and evaluation of project performance and impact; (c) developed and carryout benchmark survey and compiling thereof; and (d) developed sustainable monitoring system; Reviewed progress of works and revised the overall plan as necessary; Prepared Inception Report, Quarterly Progress Report and Annual Reports; Prepared draft Project Completion Report; Prepared detailed engineering design, drawings, specification, estimates, contract documents and implementation plan for all works [Embankment, Remedial Works, Embankment Slope Protection Works, Road Improvement, Flexible / Rigid Pavement, Rail Track Development, Slipper Design etc].

Key Details

Project Start

1998

Project End

2003

Country

Bangladesh