Detailed Engineering Design and Construction Supervision, and Project Management Consultancy Services of Dhaka Integrated Flood Protection Project (Bridging Services), Bangladesh, under ADB Fund [ADB Loan No. 1124-BAN (SF)] 1992

Rehabilitation of the Western Flood Protection Embankment (Tongi-Gabtoli-Kellermorh) by means of appropriate remedial measures determined through field investigation and laboratory testing including design of 4 sluice gates; design of about 14km long reinforced concrete box culvert; re-sectioning and realigning of about 65 km long open channel of which 6.19 km of RCC box culvert and 1.5km open channel have been completed; design of the 3rd Pump House (1st Phase); rehabilitation of floodwalls, detailed engineering design for 800m of embankment and 800m of steel sheet pile from Kellarmorh to Mitford; soil boring, soil testing and cross-section survey of western embankment and left bank of Buriganga River from Kellarmorh to Mitford; raising and flood proofing of the central spine road (from Jatrabari to Tongi bridge) including design of 6 out of 13 sluice gates; rehabilitation of pipe and canal drains and improvement of slum areas; solid waste management for Dhaka city, EIA of the project; preparation of BOQ, drawing of specifications; preparation of tender documents; assisting Project Management Office of DIFPP in evaluation of bids and award of contracts; supervision and implementation work of FY 1991-92, monitoring and evaluation, and establishing a PBME benchmark; motivating the beneficiaries for their effective participation in project implementation and O&M.

Key Details

Project Start

1992

Project End

1992

Country

Bangladesh